Step 8 — Review Resources

As previously highlighted in previous considerations, resources considerations to be understood:
-
Resource unavailability times (restricted days or hours of work)
-
consideration of long lead-time procurement of specialist resources or consultants
-
Are overseas resources required? will these resources be working remotely and will there be sufficient supervision/management?
-
specialist resources – are they in short supply and high demand, for;
-
testing
-
commissioning
-
installation
-
-
what are key client resources that may impact essential documentation reviews and onsite inspections (design review/approval/inspections)
-
what are the controlling resources/labour – eg structure crews (formworkers, reinforcement fixers) can be considered as controlling resources
-
before trying to plan the best utilisation of resources – determine what resources are available
-
check the availability and experience of local resources/contractors, particularly for controlling resources
-
are local resources already over committed
-
do local (regional/remote location) resources have the same productivity as metropolitan resources
-
is there sufficient local supervision staff available
-
do resources/supervision need to be imported to a remote location
-
is the choice of installation/assembly method influenced by:
-
resources available
-
supervision available
-
-
consider installation methods that reduce labour congestion
-
Testing & Commissioning by specialist contractors/consultants
-
will resources be on a work/time off roster eg. Fly in Fly out. Additional resources will be required to maintain work crew sizes and production rates
-
Consider whether schedule logic will be resource driven
-
consider local Industrial Relations requirements